Booral Road and Boundary Road (Urangan), intersection upgrade
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
Proserpine – Shute Harbour Road will benefit from a $21 million flood immunity upgrade at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...
On-road bicycle lanes are being constructed to improve safety at Marcoola and Mudjimba...
Detailed design has started for future expansion of parking facilities at Gaythorne station...
Detailed design is underway for active transport bridge structures and pathway to provide connectivity of the Principal Cycle Network from Gympie's southside into the Gympie CBD and surrounds...
Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...
The Sunshine Motorway, Mooloolah River Interchange Upgrade will deliver a safe, efficient, and effective transport network to meet the current and future transport needs of the Sunshine Coast...
New signalised intersection upgrade on Steve Irwin Way at Caloundra Street, Landsborough...
This project aims to improve the flood immunity and reduce flood closure times at the Pialba–Burrum Heads Road crossing...