Pacific Motorway Upgrade M1 M3 Gateway merge
The Pacific Motorway southbound in the vicinity of the Gateway Motorway merge at Eight Mile Plains has often experienced high levels of congestion. The upgrade will increase capacity and safety for...
The Pacific Motorway southbound in the vicinity of the Gateway Motorway merge at Eight Mile Plains has often experienced high levels of congestion. The upgrade will increase capacity and safety for...
We are delivering an upgrade of the M1 between Mudgeeraba and Varsity Lakes to reduce travel time and congestion, improve safety, and increase traffic flow. Interchange enhancements will improve...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...
Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...
The $1 billion Pacific Motorway Varsity Lakes to Tugun (VL2T) project is being delivered to upgrade 10 kilometres of the M1...
Planning is now underway for future stages of the Coomera Connector - the remaining 29kms between Loganholme and Coomera...
We have started work on the business case for the Pacific Motorway (M1) – Daisy Hill to Logan Motorway upgrade...
The Coomera Connector is a future state-controlled north-south corridor between Loganholme and Nerang, east of the Pacific Motorway (M1)...
The Pacific Motorway M1 is one of Australia’s busiest highways and is a national freight route...
The Exit 49 interchange upgrade will deliver significant improvements in safety and traffic flow efficiency by keeping traffic moving through the improved interchange and thereby reducing queuing...